
COVERT GENERATING
Covert Generating L.L.C. built a new power plant in Covert, MI. GLDM worked as a subcontractor for Michels Corporation to install two new Lake Michigan Water Intakes.
WATER INTAKE AND PIPING
Great Lakes Dock & Materials installed a new water intake for the Village of Caseville in Saginaw Bay. Jackson-Merkey Contractors worked as a subcontractor to install the onshore and near shore piping.

LAKE EXPRESS
Great Lakes Dock & Materials, L.L.C. designed and built the new Lake Express Ferry Dock located in Muskegon, Michigan.

PENTWATER PIER
GLD&M was Recognized as the “2001 GREAT LAKES and OHIO RIVER DIVISION CIVIL WORKS CONSTRUCTION CONTRACTOR OF THE YEAR” for this project.

WATER INTAKE AND PIPING
Great Lakes Dock & Materials installed a new water intake for the Village of Caseville in Saginaw Bay. Jackson-Merkey Contractors worked as a subcontractor to install the onshore and near shore piping.

MUNICIPAL BOAT HARBOR
Great Lakes Dock & Materials, L.L.C. designed and built the new Charles F. Moore Municipal Boat Harbor in St. Clair, Michigan.

GREAT LAKES MARINA
Great Lakes Marina was designed and built by Great Lakes Dock & Materials. The marina opened in 1990 and has expand over the years to a 274 slip full service marina.

GRAND HAVEN MUNICIPAL BOAT DOCK
Great Lakes Marina & Storage built floating docks for the City of Grand Haven’s Chinook Pier and South Channel Docks.

MOORING FACILITY AND RENOVATIONS
Great Lakes Dock & Materials, L.L.C. working as prime contractor completed Mooring Facility Renovations for St. James Township on Beaver Island Michigan.


RUDDIMAN CREEK & POND
This project involves the dredging and cleanup of contaminated sediments from both the Main Branch of Ruddiman Creek and Ruddiman Pond.

HEARTSHORN MARINA RENNOVATION
The Marine portion of the job consists of; demo existing finger piers and
install (31) new finger piers and spring piling, remove and replace 395 lineal feet of breakwater, and remove/ replace 270 lineal feet of floating dock.