Ericson’s Dock Construction – Detroit, MI. Client: Ericson’s

Great Lakes Dock and Materials was chosen to assist Ericson’s with the installation of a state of the art Combi-Wall system at their dock facility along the Detroit River.  Components of this project involve demolition of failed bulkhead from the river as well as dredging displaced materials.  Worked in conjunction with Ericson’s to install 550 linear feet of 100’ PAZ54/NZ 19 Pipe-Z combined wall along with  200 100’ long batter piles. 

Leave a Reply

Your email address will not be published.