B.C. Cobb Bulkhead install – Muskegon, MI. Client: Consumers Power

This large project involved: installation of over Install 2,035 LFT of 70’ Long (142,450 sqft) Steel Sheet Piling Front Wall with full length Steel Cap Install 1,314 LFT of 15’ Long (19,710 sqft) Steel Sheet Piling Anchor Wall Install Waler Systems and 80’ Long Tie-Back Rods Provide and Install Complete Fendering and Bollard System for 1,000 foot long Ships Demo …

Burke Lakefront Airport Shoreline Rehabilitation – Cleveland, OH. Client City of Cleveland

This project involved sloping and grading the original shoreline including some dredging and demolition.  Outfalls were improved and extended lakeward.  The shoreline was then stabilized with multiple layers of stone.  The area was approximately half a mile long and was immediately adjacent to an active airport runway.   Great Lakes Dock and Materials team worked with the owner and airport …